We've sent a verification link by email
Didn't receive the email? Check your Spam folder, it may have been caught by a filter. If you still don't see it, you can resend the verification email.
Enormous pumps running at at TVA hydroelectric facility at Elder Mountain, Tennessee. Very loud machine sounds, good for factories, jet airplanes, and other heavy industry situations. There is some talking at the beginning, but after 20 or 30 seconds, it's a very clean recording. Made with an iPhone.
Type
M4a (.m4a)
Duration
1:22.337
File size
647.8 KB
Sample rate
44100.0 Hz
Bitrate
64 kbps
Channels
Stereo