We've sent a verification link by email
Didn't receive the email? Check your Spam folder, it may have been caught by a filter. If you still don't see it, you can resend the verification email.
Metal Pipe in Large Concrete Tunnel: Metal pipe, reverb, concrete tunnel reverb, percussion sounds
Date: February 05, 2016
Time: 7:33 PM
Recording Number: T23
Location: Underground Tunnel, University of Lethbridge, Lethbridge, Alberta, Canada
Technical: Recorded with Sound Devices Recorder and a Rode NT4 Shotgun Microphone.
Processing: Izotope RX5 De-Noise
Recorded by The IntraEnvrionmental Sound Project
Type
Wave (.wav)
Duration
0:17.000
File size
4.7 MB
Sample rate
48000.0 Hz
Bit depth
24 bit
Channels
Stereo