We've sent a verification link by email
Didn't receive the email? Check your Spam folder, it may have been caught by a filter. If you still don't see it, you can resend the verification email.
Trackside maintenance work in Cardiff. Digger unloads ballast. Swansea to Paddington express passes R->L. Bulldozer levels ballast, approaches R-L and reverses with alarm R-L. Complex compound industrial soundscape, with significant percussive and noise elements, and a strong dramatic element in the approach and pass of the train. Recorded with Zoom H2n, edited in Wavelab. No processing.
Type
Wave (.wav)
Duration
2:01.239
File size
30.6 MB
Sample rate
44100.0 Hz
Bit depth
24 bit
Channels
Stereo